Skip to content
Vegas Retold

The history of Nevada Palace Hotel and Casino

Opened July 1979 Closed February 29, 2008

Nighttime illustration of Nevada Palace's illuminated casino entrance and marquee announcing its February 29 closing.
Illustration of Nevada Palace's former casino entrance and closing marquee, adapted from a user-supplied historical photograph.

Vegas Retold AI illustration, adapted from user-supplied historical photograph; original creator unknown

Image source

AI illustration adapted from supplied photograph; architecture simplified, historic lettering and closing message retained.

Nevada Palace opened on Boulder Highway in July 1979, a few months after nearby Sam’s Town. Despite its grand name, it was a relatively small hotel-casino. A contemporary farewell account identified casino veteran Gene Lucas and a group of Los Angeles partners behind its beginning.

Its early years were unsettled. The same account described a 1980 bankruptcy, a brief hotel closure and a longer interruption to casino operations, followed by another bankruptcy in 1983. By late 1985, Bill Wortman had become a co-owner. The property survived those changes and developed a clientele that valued its smaller scale.

In a 2006 interview, Wortman said some Nevada Palace customers felt overwhelmed by larger casinos. That observation helps explain the appeal of a modest Boulder Highway property: its size could be part of the attraction. But Wortman was also involved in the larger Cannery in North Las Vegas, and a new Cannery resort was planned beside Nevada Palace.

Cannery Casino Resorts acquired Nevada Palace’s gaming assets in September 2006 and continued operating it temporarily as construction proceeded. Company records fix its final closure at February 29, 2008. Contemporary reports describe employees preparing for work at the new Eastside Cannery, which opened that August.

The redevelopment changed the arrangement of the site. Nevada Palace’s old roadside area became front parking for Eastside Cannery, whose main building stood farther east. This was a replacement within a larger property, rather than a renovation that simply gave the old casino another name.

Eastside Cannery itself closed in 2020 and was demolished in 2026. The map for Nevada Palace therefore marks an approximate former-site vicinity at the old 5255 Boulder Highway address, close to the later frontage parking. The exact outline of its old hotel and casino has not been reconstructed here. Its pin is deliberately separate from the later Eastside building point.

  1. Opening, early setbacks and ownership

  2. Why some customers preferred a small casino

  3. Temporary operations and final closure

  4. The transition to the new resort

  5. Nevada Palace’s historic address

  6. The later site and separate building area

  7. The later casino is also demolished

What remains uncertain

  • The original opening is retained at July 1979 month precision. An exact opening day has not been verified here.
  • The pin marks an approximate roadfront site vicinity, supported by the contemporary frontage-parking description. The original hotel/casino footprint has not been surveyed or reconstructed.
  • One contemporary gallery caption calls February 28 the final business day; company records and other reporting explicitly give February 29, 2008. The company’s final closure date is used.

This site through time

Replaced by Eastside Cannery Casino and Hotel

August 28, 2008

Eastside Cannery replaced Nevada Palace within a larger Boulder Highway redevelopment. Construction proceeded while parts of Nevada Palace still operated; the older casino closed February 29, 2008, and its roadside area became frontage parking. Eastside opened August 28, 2008, in a new main building farther east. The former properties share a broader site, not identical walls or footprints. Eastside later closed in 2020 and was demolished in 2026.

Historical source — OCM Holdco 2008 Form 10-K, Eastside Cannery/Nevada Palace and 2008 Highlights: replacement, continued old operations, closure29February2008, new opening28August2008. Contemporary LVRJ29February2008 farewell report establishes old site became parking in front of new resort; distinct footprint. BoydJune2026 Note9 confirms later closure and implosion.

  • The exact original Nevada Palace footprint has not been reconstructed. Its map point is approximate roadfront vicinity, separate from the later main-building point.
  • Nevada Palace LLC survived as the later property’s operating-company name; this legal continuity does not establish unchanged physical buildings.
Suggest a correction or source