Skip to content
Vegas Retold

The history of Horseshoe Las Vegas

Opened December 1973

Bally’s-branded hotel towers behind the multicolored Grand Bazaar roofs in 2018, before the Horseshoe rebrand and Paris tower conversion.
Bally’s towers and the Grand Bazaar Shops on April 23, 2018, before the Horseshoe name and the later Paris tower conversion.

Alexander Migl / Wikimedia Commons, CC BY-SA 4.0

Image source· License

Original source photograph retained without editorial alteration. Responsive displays may resize and crop the presentation.

Horseshoe Las Vegas carries several layers of Strip history. It began as Kirk Kerkorian’s original MGM Grand in December 1973, became Bally’s in 1986 and adopted the Horseshoe name in 2022. These are successive identities of this resort. The MGM Grand opened farther south in 1993 and Downtown’s Binion’s Horseshoe are separate properties.

The original MGM Grand

The original MGM Grand was designed by Martin Stern Jr. as a large hotel and entertainment complex. Its scale belonged to the same ambition that had produced Kerkorian’s International Hotel: gambling, rooms and major performances brought together in one destination. Contemporary reporting recalls Dean Martin appearing at its first opening and returning for the resort’s reopening in 1981.

The 1980 fire and reopening

The intervening disaster is central to the history. On November 21, 1980, a fire spread from the casino-level Deli through the ground-floor complex, while smoke reached the hotel tower. The revised NFPA investigation records 85 deaths, including a victim who died weeks later. The building had some sprinklers, but the casino and Deli were not protected. Clark County’s fire department connects the disaster and the subsequent Hilton fire with major changes to hotel fire protection. The resort reopened in July 1981.

Bally’s becomes Horseshoe

Bally Manufacturing’s 1986 purchase brought the Bally’s name. The property continued to evolve rather than becoming a wholly new resort each time its signs changed. In 2022, the World Series of Poker moved from the Rio to the neighboring Bally’s and Paris properties. The Horseshoe rebrand took effect that December; the operator’s ceremonial grand opening followed on March 24, 2023. The brand’s Downtown origins do not mean that Binion’s building moved to the Strip.

One tower joins Paris

A later change crossed the boundary between the adjoining resorts. Caesars announced in May 2023 that Horseshoe’s Jubilee Tower would be renovated and incorporated into Paris as Versailles Tower. Renovated rooms were being offered by August 2024. This was the reassignment and remodeling of part of the complex, while Horseshoe continued as a separate casino and hotel.

The property and history photograph today

The operator’s October 2026 fact sheet confirms Horseshoe at 3645 South Las Vegas Boulevard. The history photograph shows the Bally’s-era towers and Grand Bazaar Shops in April 2018, before either the Horseshoe rebrand or the Paris tower conversion. It should not be read as a record of current signs or current room allocation.

  1. The original MGM Grand and the later names

  2. Back in business after the fire

  3. The fire investigation

  4. The fire department’s account of the aftermath

  5. The December 2022 name change

  6. The March 2023 celebration

  7. A tower changes resort identity

  8. Versailles rooms available by August 2024

  9. The completed tower conversion

  10. The operating Horseshoe in October 2026

  11. The current Horseshoe building area

  12. The Bally’s-era towers in 2018

What remains uncertain

  • The original MGM Grand opened in December 1973; December 4 and 5 appear in different accounts, so no exact day is selected.
  • The 1980 fire and temporary closure did not end this property’s identity. The current MGM Grand opened elsewhere in 1993.
  • Bally’s and Horseshoe are names of the same Strip resort. Downtown Binion’s and the modern Bally’s corporation are not identical to this physical property.
  • The Jubilee-to-Versailles conversion affected one tower, not the whole Horseshoe resort. Integration occurred in phases; no single exact completion day is asserted.
  • The history photograph is dated April 23, 2018 and shows Bally’s-era signs and buildings, before later changes.

This site through time

Shared or overlapping site with Paris Las Vegas

Paris Las Vegas expanded by taking over and renovating the former Jubilee Tower of the neighboring Horseshoe/Bally’s complex as Versailles Tower. Caesars announced the project in May 2023; renovated rooms were available by August 2024, and the operator’s October 2026 record confirms the integrated tower and connecting bridge. This concerns one existing tower and its resort affiliation. Horseshoe and Paris both continued as separate hotel-casinos; neither whole property was renamed into or demolished for the other.

Historical source — Operator October 2026 fact sheet, page 1: former Jubilee Tower at Horseshoe now open as Paris’s Versailles Tower, with bridge. May 1, 2023 operator project announcement and August 13, 2024 room-availability update establish phased sequence; BWA architect-of-record project confirms conversion of the existing tower. Those dates are not asserted as a single exact transfer/completion day.

  • Only the former Jubilee/Versailles Tower is the reused part; complete resort footprints and entrances are not equated.
  • The work occurred in phases across 2023–24; a single day marking completion of the whole conversion has not been established.
  • This is a partial-building shared-site and renovation history, not a complete-property replacement or rename.
Suggest a correction or source